Rigging work
12.1 Rigging work checklists for crane operation with the main boom
12 - 6 3 112 993 en Operating manual GMK 6400
12.07.2013
6. Depending on transport:
– Attach the hook block to the bumper;
à p. 12 - 110
– Set down the hook block and unreeve the hoist rope;
à Setting down the hook block, p. 12 - 112,
à Unreeving the hoist rope, p. 12 - 118.
7. For on-road driving without trailer:
– Turn superstructure to the 180° position to the front with the RCL
adjusted accordingly
– Place the main boom on the boom rest
8. For on-road driving with a trailer:
– Set down the superstructure on a trailer with the RCL adjusted accord-
ingly and switch on the boom floating position;
à p. 6 - 8
– Switch on slewing gear freewheel;
à p. 6 - 7
– Switch on boom pre-tensioning if necessary;
à p. 6 - 9
– Switch off the houselock;
à p. 11 - 15
9. Turn off the engine for crane operation;
à p. 10 - 17

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 6400 and is the answer not in the manual?

Manitowoc GROVE GMK 6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals