Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating manual GMK 6400 3 112 993 en 12 - 7
12.07.2013
10. Remove anemometer and the air traffic control light; à p. 12 - 132
11. Remove camera on main boom;
à Camera on main boom, p. 12 - 137.
Lower the slewable spotlights;
à p. 11 - 109
12. Retract the outriggers;
à CHECKLIST: Retracting the outriggers,
p. 12 - 31
13. Activate (unlock) the suspension.
The symbol (1) must be green (suspension on);
à p. 5 - 15
14. Turn off the engine and, if necessary, remove the hand-held control and
stow it away in the driver's cab;
à Disconnecting the hand-held control,
p. 12 - 22
15. When the truck crane is no longer being used;
à In case of work breaks
of more than 8 hours
, p. 11 - 129

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 6400 and is the answer not in the manual?

Manitowoc GROVE GMK 6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals