Rigging work
12.8 Rigging the auxiliary hoist
Operating manual GMK 6400 3 112 993 en 12 - 95
12.07.2013
4. Connect the hand-held control to the rear right of the turntable and start
the crane engine;
à p. 12 - 21.
5. Bolt the 15 t base plate to the auxiliary hoist;
à p. 12 - 102.
6. Continue rigging the counterweight;
à CHECKLIST: Counterweight,
rigging
, p. 12 - 62, point 5. and point 6.
7. Raise the catcher and block it with the support;
à p. 12 - 99.
8. Check the auxiliary hoist for correct functioning;
à p. 12 - 105.
9. Disconnect the hand-held control;
à p. 12 - 22.
10. Reeve the hoist rope and connect the lifting limit switch;
à Reeving and
unreeving the hoist rope
, p. 12 - 114.