MCS301 - 3ph meter Page 58 of 142
MCS301 meter - product Manual 1.25 MetCom Solutions GmbH
• Setting time
Clock adjustment larger than a defined synchronization limit is recorded in the event
profile and the affected entries in the load profile are marked with the CAD flag.
o Time changes within capture period
Table 21 show a clock adjustment from 21:16 to 21:20. The entry at 21:30:00
will be marked with the CAD flag.
Date/time
Register value
2017-02-04, 21:15:00 0 0 0 0 110,2kW
2017-02-04, 21:30:00 0 1 0 0 123,4kW
2017-02-04, 21:45:00 0 0 0 0 153,4kW
Table 21: Time change within capture period
Any clock adjustment (forward or backwards) within the capture period is
marked in this way. If the clock adjustment is smaller than the synchronization
limit (depending on parameter setting) no entry is recorded.
o Advancing the time set over the end of the period
Table 22 show a clock adjustment from 21:16 to 21:36. At 21:30 an entry is
generated with the CAD flag set since the period was not closed correctly. The
entry at 21:45:00 is be marked with the CAD flag.
Date/time
Register value
2017-02-04, 21:15:00 0 0 0 0 110,2kW
2017-02-04, 21:30:00 0 1 0 0 123,4kW
2017-02-04, 21:45:00 0 1 0 0 153,4kW
2017-02-04, 22:0000 0 0 0 0 156,9kW
Table 22: Advancing the time over the end of the period
o Advancing the time over several periods
Table 23 show a clock adjustment from 21:16 to 22:06. All generated
intermediate values are marked with the CAD flag.
Date/time
Register value
2017-02-04, 21:15:00 0 0 0 0 110,2kW
2017-02-04, 21:30:00 0 1 0 0 123,4kW
2017-02-04, 22:15:00 0 1 0 0 153,4kW
2017-02-04, 22:30:00 0 0 0 0 159,6kW
2017-02-04, 22:45:00 0 0 0 0 162,9kW
Table 23: Advancing the time over several periods