Installation and operation precautions
1
d-Color MF25 1-21
1.5 Space requirements
To ensure that machine operation, consumables replenishing, part replace-
ment, and regular maintenance can easily be performed, adhere to the rec-
ommended space requirements detailed below.
2
Reminder
Be sure to allow a clearance of 100 mm (4 in.) or more at the back of this
machine for the ventilation duct.
Unit: mm (inch)
MF25+FS-603+PC-403
285
(11-1/4)
125
(49-1/4)
286
(11-1/4)
421
(16-1/2)
746
(29-1/4)
100
(4)
358
(14)1182 (46-1/2)