EasyManua.ls Logo

Oracle SuperCluster T5-8 - Page 128

Oracle SuperCluster T5-8
356 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connect Power Cords to the Rack
4.
Ensure that the correct power connectors have been supplied with the power
cords.
5.
Unfasten the power cord cable ties.
The ties are for shipping only and are no longer needed.
128 Oracle SuperCluster T5-8 Owner's Guide • May 2016

Table of Contents

Related product manuals