3: Troubleshooting Operational Check
38
Operational Check Flow
Follow the screen instructions and respond to the prompts. Once you have answered the last prompt
(Sync button), you can leave the Efficia DFM100 unattended, and the Op Check will complete.
WARNING: Be sure to safely discharge paddles tested during the Op Check, as described in “Operational Check
Te s t s” below.
Operational Check Tests
General System Test: Tests the following parameters and features:
• internal case temperature
• internal voltages of the power supplies and the clock battery
• read / write access between PCAs, modules, and programmable components
• executable device software and file system integrity, etc.
Therapy Knob: Tests if the Therapy Knob is reading the correct position.
Figure 33 Operational Check Screen — in Progress