ABL800 FLEX Operator's Manual 3. Installation and setup
Quality control setup, Continued
QC schedule
(continued)
Step Action
3.
Select the slot/quality control solution (entered in the Quality Control
Solutions program), using the up/down arrow buttons in the box.
Confirm with Select.
4.
Highlight the "Weekdays" box using the Field down button.
Activate the relevant check buttons to select the days of the week this
measurement should be performed.
5.
Highlight the "Start time" box.
Key in the time to perform a measurement and confirm with Enter on
the keypad.
NOTICE: The symbols for the automatic or manual quality control
(given on the previous page) will automatically appear in the
schedule.
6.
Highlight the "Repeat" box. Select the interval the measurement
should be repeated, using the up/down arrow buttons in the box.
7.
Press Back to return to the Quality Control Schedule Setup screen.
If more than one quality control solution was scheduled, the schedule
screen will look like this:
To edit the schedule, press Edit and follow the procedure above.
Continued on next page
3-41