Roche Diagnostics
136 Instructions for Use · Version 13.0
5 Installation and put out of operation cobas b 123 POC system
Put out of operation
Preparing the instrument for transportation
p To prepare the instrument for transportation
1
Remove the printer paper from the printer.
2
Remove the USB storage device.
3
Disconnect the barcode scanner and the network connection on the rear panel of
the instrument.
4
Disconnect the power supply from the instrument.
s