February 2013
1-6
ColorQube® 9303 Family
SCP 3
Service Call Procedures
• GP 4 Machine Software
• GP 5 Customer Administration Tools
• GP 6 Marking Unit Maintenance Positions
• GP 7 System Grounding Verification
• GP 8 Special Tools and Consumables
• GP 9 User Interface Service Menu Map
• GP 10 How to Check a Motor
• GP 11 How to Check a Sensor
• GP 12 How to Check a Solenoid or Clutch
• GP 13 How to Check a Switch
• GP 14 How to Switch Off the Machine or Switch On the Machine
• GP 15 Location and Function of PWB LEDs
• GP 16 How to Safely Lift or Move Heavy Modules
• GP 17 Network Clone Procedure
• GP 18 Machine Lubrication
• GP 19 Machine SIM Card Matrix
• GP 20 Paper and Media Size Specifications
• GP 21 Installation Space Requirements
• GP 22 Electrical Power Requirements
• GP 23 Environmental Data
• GP 24 Hardware Kit Contents
• GP 25 First Copy / Print Out Time and Power On / Off Time
• GP 26 Restriction of Hazardous Substances (RoHS)
• GP 27 Cleaning Procedure
• GP 28 Marking Unit Assembly Wiring Harnesses
• GP 29 Component Locations
• GP 30 How to Mask Jets / Jet Substitution
• GP 31 How to Open and Close the Stripper Gate
• GP 32 User Interface Panel Diagnostics
• GP 33 Machine Features
• GP 34 Service Plan
• GP 35 Copy and Print Speeds
• GP 36 How to Unlock the Cleaning Unit
•
GP 37 Post Part Replacement Routines
• GP 38 How to Set the Date and Time
• GP 39 How to Enable HTTP
• GP 40 Glossary of Terms, Acronyms and Abbreviations
• GP 41 How to Configure the PWS to Ping a Device
• GP 42 How to Set the IP Address of the PWS
• GP 43 How to Change Ethernet Speed
• GP 44 How to Disable the Firewall of the PWS
• GP 45 How to Check the Battery on the NVM Module PWB
• GP 46 How to Identify the Different Printhead Connectors
• GP 47 Remote Diagnostics
• GP 48 How to Re-Enter Optional Feature Installation Keys
• GP 49 USB Connection Mode