4.12 Test Run Checklist
Review the checklist before performing a test run. Check each item that applies.
No. Checklist Page
1 Thoroughly read the manual before performing a test run.
2 Turn the power on. 123
3 Set the voltage for the power supply to E1-01. 134
Check the items that correspond to the control mode being used.
WARNING! Sudden Movement Hazard. Ensure start/stop and safety circuits are wired properly and in the correct state before energizing
the drive. Failure to comply could result in death or serious injury from moving equipment. When programmed for 3-Wire control, a momentary
closure on terminal S1 may cause the drive to start.
No.
Checklist Page
V/f Control (A1-02 = 0)
4 Select the best V/f pattern according to the application and motor characteristics.
5 Perform Rotational Auto-Tuning for V/f Control if using Energy Saving functions. 143
Open Loop Vector Control for PM (A1-02 = 5)
6 Perform Auto-Tuning as described. 143
4.12 Test Run Checklist
YASKAWA ELECTRIC TOEP C710616 45F YASKAWA AC Drive – Z1000 User Manual
155
4
Start-Up Programming
& Operation

Table of Contents

Other manuals for YASKAWA Z1000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the YASKAWA Z1000 and is the answer not in the manual?

YASKAWA Z1000 Specifications

General IconGeneral
ModelZ1000
CategoryController
Humidity95% RH or less (non-condensing)
Control MethodV/F Control
Frequency Range400 Hz
ProtectionOvercurrent, Overvoltage, Undervoltage, Overheat
Communication OptionsModbus
Operating Temperature-10 to 50°C
Storage Temperature-20 to 60°C
AltitudeUp to 1000 meters without derating
Cooling MethodForced Air
Enclosure RatingIP20
Voltage Class200V, 400V