EasyManua.ls Logo

ACU-RITE TURNPWR - Testing the Program

ACU-RITE TURNPWR
195 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Demonstration program | Testing the program
9.5 Testing the program
A new program should always be tested first.
Run options
Two options are available:
Dry Run
Single Step
Dry Run will move the tool but no material will be cut.
Single Step will run the program one step at a time, then pause
until GO is pressed to proceed with the next step.
To perform a test run:
Press the Run Options soft key
Selected Dry Run or Single Step
Dry run with tool movement
NOTICE
Before you press the GO key to begin the dry run, ensure that
the tool will not touch the workpiece.
To avoid tool interference, do one or more of the following:
Remove the tool or workpiece
Reestablish the Z datum away from the part
The complete program will be run, and the cutting of the part will
be displayed graphically as the program steps are being performed.
The following steps will run the program graphically, and the tool
will move.
To perform a Dry Run:
Press the Run Options soft key
Press the Dry Run soft key
Highlight step 001 of the program
Press the Exit soft key
Press the GO soft key (the tool carriage will move)
9
ACU-RITE | TURNPWR | User's Manual | 08/2020
155

Table of Contents

Related product manuals