142 1100 Series Nano Pump Service Manual
3 Repairing the Pump
10 Re-install the mixing chamber in its holder
11 Re-install the flow sensor. Reconnect the capillaries and the cable.
12 Re-install the EMPV. Reconnect the capillaries, the waste tube and the
cable.
13 Reconnect both active inlet valve cables.
14 Replace the top foam section, optional interface board, front cover, and top
cover (see “Replacing the Top Cover and Foam” on page 154).