144 1100 Series Nano Pump Service Manual
3 Repairing the Pump
8 Place the new fan into the recess. Make sure that the air flow is directed as
indicated (arrow on the fan points in the same direction as on the
foam).Connect the cable to the main board (P17).
9 Re-install pump assembly B. Reconnect all capillaries and connectors. (P8,
P21).
10 Re-install the Z-panel and the damper. Reconnect the capillaries and
connectors. (P16, P11, P20)
11 Re-install the mixing chamber to its holder.
12 Re-install the flow sensor. Reconnect the capillaries and the cable.
13 Re-install the EMPV. Reconnect the capillaries, the waste tube and the
cable.
14 Replace the top foam section, optional interface board, front cover, and top
cover (see “Replacing the Top Cover and Foam” on page 154).