EasyManua.ls Logo

Anritsu MT8820C - Rx Measurements for 3 Dl Ca; Throughput Measurement Example

Anritsu MT8820C
268 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
152
RX Measurements for 3DL CA 3.5.
Throughput Measurement Example 3.5.1.
3.5.1.1. MT8820C
1. Synchronize the frame timing between 3 cells (2.3.2)
2. Perform Initial Condition setting. (2.3.3)
3. Perform UE Location registration. (2.3.4)
4. Connect to Test Mode.(2.3.5)
5. [PCC] Execute TPUT_MEAS ON to set Throughput Measurement to On.
6. [PCC] Execute SWP to measure the power.
7. [PCC] Execute TPUT? PCC to confirm the PCC Throughput measurement result.
8. [PCC] Execute TPUT? SCC1 to confirm the SCC1 Throughput measurement result.
9. [PCC] Execute TPUT? SCC2 to confirm the SCC2 Throughput measurement result.
10. [PCC] Execute TPUT_BLERCNTNACK? PCC to confirm the PCC Error Count (NACK).
11. [PCC] Execute TPUT_BLERCNTNACK? SCC1 to confirm the SCC1 Error Count (NACK).
12. [PCC] Execute TPUT_BLERCNTNACK? SCC2 to confirm the SCC2 Error Count (NACK).
13. [PCC] Execute TPUT_BLERCNTDTX? PCC to confirm the PCC Error Count (DTX).
14. [PCC] Execute TPUT_BLERCNTDTX? SCC1 to confirm the SCC1 Error Count (DTX).
15. [PCC] Execute TPUT_BLERCNTDTX? SCC2 to confirm the SCC2 Error Count (DTX).
Figure 3.5.1-1 Example of FDD DL CA 3CCs Throughput Measurement Result (MT8820C)
3.5.1.2. MT8821C
1. Perform Initial Condition setting. (2.3.3)
2. Perform UE Location registration. (2.3.4)
3. Connect to Test Mode.(2.3.5)

Table of Contents

Other manuals for Anritsu MT8820C

Related product manuals