EasyManua.ls Logo

Ecolab Elados EMP II E60 - Setup and Installation

Ecolab Elados EMP II E60
218 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
417101438_EMPII_E60.docx
- 81 -
Rev. 11-02.14
5 Setup
5.1 EMP II E60
Fig. 5.1 EMP II E60 (front view)
Fig. 5.2 EMP II E60 (side view)
5.2 EMP II E60
PLUS
Fig. 5.3 EMP II E60 (front view)
Fig. 5.4 EMP II E60 (side view)
Pos.
Description
1
Suction valve (connection on the suction side)
2
Diaphragm breakage sequence
3
Venting connection (refeeding into the container)
4
Pump head
5
Vent screw
6
Pressure valve (connection on the pressure side)
A
Rail for connecting the dongle box
B
Dongle box
Flow direction of the metering medium
5.3 Indicators / Controls / Jacks
5.3.1 Versions EMP II E60 and EMP II E60
PLUS
Fig. 5.5 Version EMP II E 60 and EMP II
E60
PLUS
Pos.
Description
1.
Control knob for setting the stroke length
2.
Menu/Exit, up arrow key
3.
Menu/Exit, down arrow key
4.
Start/Stop key (Enter function)
5
Test key
6.
Graphical display
I
input for low-level advance warning and empty report
(see chapter 7.2.2 & 14.3.5.1)
II
input for pulse- / standard signal and metering lock
(see chapter 7.2.3 & 14.3.5.2)
III
empty report, fault report and stroke signal
(see chapter 7.2.4 & 14.3.5.3)
IV
mains power supply (see chapter 7.2.5)
5.3.2 “Dongle box” ports
Pos.
Description
V
input for oval gear meter
VI
connection for pulse input to EMP pump (input II)
VII
input for batch pulse and metering lock
VIII
input for pulse, standard signal input and metering lock
Fig. 5.6 “Dongle box” ports

Table of Contents

Other manuals for Ecolab Elados EMP II E60

Related product manuals