5 Setup
5.1 EMP II E60
Fig. 5.1 EMP II E60 (front view)
Fig. 5.2 EMP II E60 (side view)
5.2 EMP II E60
PLUS
Fig. 5.3 EMP II E60 (front view)
Fig. 5.4 EMP II E60 (side view)
Suction valve (connection on the suction side)
Diaphragm breakage sequence
Venting connection (refeeding into the container)
Pressure valve (connection on the pressure side)
Rail for connecting the dongle box
Flow direction of the metering medium
5.3 Indicators / Controls / Jacks
5.3.1 Versions EMP II E60 and EMP II E60
PLUS
Fig. 5.5 Version EMP II E 60 and EMP II
PLUS
Control knob for setting the stroke length
Menu/Exit, down arrow key
Start/Stop key (Enter function)
I
input for low-level advance warning and empty report
(see chapter 7.2.2 & 14.3.5.1)
II
input for pulse- / standard signal and metering lock
(see chapter 7.2.3 & 14.3.5.2)
III
empty report, fault report and stroke signal
(see chapter 7.2.4 & 14.3.5.3)
mains power supply (see chapter 7.2.5)
5.3.2 “Dongle box” ports
input for oval gear meter
connection for pulse input to EMP pump (input II)
input for batch pulse and metering lock
input for pulse, standard signal input and metering lock
Fig. 5.6 “Dongle box” ports