EasyManua.ls Logo

FEI Scios 2 - Installation

FEI Scios 2
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System Options: Quick Loader
C O N F I D E N T I A L – FEI Limited Rights Data 7-37
Installation
The Quick Loader is pre-installed, no special adjustment is needed only the loading rod is not installed for the
transport.
1. Unpack the lead glass lid.
2. Remove four screws holding the cover of the loading rod feedthrough.
3. Use the same screws to attach the loading rod to the loader chamber.
Loading position
The load / unload position is preset from factory. If a calibration is needed, run the Quick Loader Alignments first.

Table of Contents

Related product manuals