Initial Preparation
2.1
THIS SECTION
This section contains:
Receiving and Inspecting Shipments;
Returning Equipment
For
Repair;
Preparation
For
Storage
or
Shipment;
Preparation For Use;
Initial
Tum
on;
Functional Checkout;
Routine Maintenance.
2.2 RECEIVING AND INSPECTING SHIPMENTS
Section 2
Use the following steps to inspect a shipment
of
Wavetek-Datron equipment.
1.
Inspect the shipment.
If
the shipment is damaged have the driver describe the box
damage and list shortages on the delivery bill.
If
you find unreported shortages or damage, notify the shipper before further
unpacking.
2. After unpacking the boxes. Save all
of
the packing material.
3.
Inspect
the
equipment for damage.
Inspect
it
carefully, regardless
of
the
condition
of
the shipping boxes.
4.
If
necessary, file a damage daim.
If
any damage is found,
caU
the shipper within
10 days and start the
daim
process.
5.
CalI Wavetek-Datron. CalI Wavetek-Datron's Customer Service department
and tell them that the equipment arrived damaged.
2.3 RETURNING EQUIPMENT FOR REPAIR
Use the following steps
if
you should
ever
need to return the Model 395
to
Wavetek-
Datron for repair.
1.
Save the packing mate
rial.
Always retum the equipment to Wavetek-Datron in
its original packing material and boxes.
If
you use inadequate packing material,
you will have
to pay to repair any shipping damage. Carriers will
not
pay
daims
on
incorrectly packed equipment.
2.
Call Wavetek-Datron for a Return Authorization. Wavetek-Datron's customer
service representative will ask for the name
of
the person retuming the equipment
Plus,
the
representative will ask for your telephone number, company name,
equipment type and serial number,
and
a description
of
the problem.
Initial Preparation 2-1
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com