6 Send from Folder
320
Send from Folder
6
[Link Job Flow Sheet to Folder] Screen
You can change the link between the folder and its job flow sheet.
Note •Linking, delinking, and auto start settings can be also performed when you create a folder.
1 Select a job flow sheet to link to.
Important • Selecting [Save] without selecting a job flow
sheet does not set a link. If the selected job
flow sheet is already linked, the link is
canceled.
Note •Drag or flick the screen vertically to switch the
screen to be displayed. For information on
how to drag or flick, refer to "Touch Screen"
(P.88).
• Select [ ] to return to the previous screen or [ ] to move to the next screen.
• You can sort the list in ascending or descending order by selecting either [Name] or [Updated].
2 Select [Job Flow Settings].
3 Select [Create/Change Link].
4 Select any option.
Refresh
Displays the updated information.
Create
Displays the [Create New Job Flow Sheet] screen.
For more information, refer to "Create New Job Flow Sheet" (P.527).
Edit/Delete
Displays the [Details] screen.
For more information, refer to "Edit/Delete" (P.531).