EasyManua.ls Logo

GE Voluson P6 - Section 8-43 Functional Checks after FRU replacement (Debrief Guidelines)

GE Voluson P6
553 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCAREDRAFT VOLUSON® P8 / VOLUSON® P6
DIRECTION 5459672-100, R
EVISION 6 DRAFT (JANUARY 17, 2013) PROPRIETARY SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-105
Section 8-43
Functional Checks after FRU replacement (Debrief Guidelines)
1.) Perform required Functional and/or Leakage Current tests based upon the FRU being replaced.
2.) Clarify the scripts to debrief a Service Dispatch using your pole's dispatch tool.
Use this script in the Service Comments when debriefing a Service Dispatch.
For a replaced FRU, use the following debrief script:
Proprietary Service Manual, Voluson® P8 / Voluson® P6, Revision Voluson® P8 / Voluson® P6,
Section [fill in appropriate section]. Equipment passed all required tests and is ready for use.
And, if testing leaking current, use the following text.
Proprietary Service Manual, Voluson® P8 / Voluson® P6, Revision Voluson® P8 / Voluson® P6,
Section [fill in appropriate section]. Leakage Current meets allowable limits. Equipment passed
all required tests and is ready for us.

Table of Contents

Other manuals for GE Voluson P6

Related product manuals