GE HEALTHCAREDRAFT VOLUSON® P8 / VOLUSON® P6
DIRECTION 5459672-100, R
EVISION 6 DRAFT (JANUARY 17, 2013) PROPRIETARY SERVICE MANUAL
Chapter 3 - Setup Instructions 3-1
Chapter 3
Setup Instructions
Section 3-1
Overview
3-1-1 The Purpose of Chapter 3
This chapter contains information needed to setup the Voluson® P8 / Voluson® P6. Included are
procedures to receive, unpack and configure the equipment.
A worksheet is provided (see: page 3-73 to page 3-74) to help ensure that all the required information
is available, prior to setup the system.
Section 3-2
Set Up Reminders
3-2-1 Average Installation Time
Once the site has been prepared, the average installation time required is shown in Table 3-2 below.
Table 3-1 Contents in Chapter Voluson® P8 / Voluson® P6
Section Description Page Number
3-1
Overview
3-1
3-2
Set Up Reminders
3-1
3-3
Receiving and Unpacking the Equipment
3-4
3-4
Preparing for Set Up
3-8
3-5
Connection of Auxiliary Devices
3-10
3-6
Completing the Set Up
3-23
3-7
Printer Installation
3-30
3-8
System Configuration
3-54
3-9
Available Probes
3-63
3-10
Software/Option Configuration
3-63
3-11
Connectivity Setup
3-64
3-12
Network IP Address Configuration
3-70
3-13
Connectivity Setup Worksheet
3-73
3-14
Paperwork
3-75
Table 3-2 Average Installation Time
Description Average Installation Time Comments
Unpacking the scanner 0.5 hours
Installing the scanner / options / printers 0.5 to 1.5 hours depends on required configuration
DICOM Option (connectivity) 0.5 - 1.5 hours depends on configuration amount