8-44 Section 8-19 - Replacement of the Trackball
Section 8-19
Replacement of the Trackball
8-19-1 Manpower
One person, 10 minutes
8-19-2 Tools
Philips Screwdriver
8-19-3 Preparations
1.) Power Off/Shutdown the system as described in 4-3-2 on page 4-4.
8-19-4 Removal Procedure
1.) Remove 4 PROBE HOLDERS from the OPIO.
Figure 8-52 Removing the 4 PROBE HOLDERS