EasyManua.ls Logo

Honeywell Series A - 6.3 Monitoring Fieldbus Functions Through Monitoring Tab; Inactivating;Activating a Link

Honeywell Series A
560 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. Operation
6.3. Monitoring Fieldbus Functions Through Monitoring Tab
R400 Experion PKS Series A Fieldbus Interface Module User's Guide 253
July 2010 Honeywell
6.3 Monitoring Fieldbus Functions Through Monitoring
Tab
Inactivating/Activating a Link
Use the following procedure to inactivate/activate a fieldbus Link through the Monitoring
tab in Control Builder.
ATTENTION
Inactivating a fieldbus Link essentially shuts downs the Link and the CIOM-A
FIM, if both Links are inactivated, and interrupts the transfer of data to the
Experion system. Be sure your system can tolerate the lost of live data, while
the link is inactive.
TIP
You can initiate this same function through the corresponding Detail display
in Station.
Step Action Result
1
In Monitoring tab, click LINK icon.
Click the Toggle State button in
the toolbar.
Opens Change State dialog box.

Table of Contents

Related product manuals