R400   Experion PKS Series A Fieldbus Interface Module User's Guide  533 
July 2010  Honeywell   
17. Appendix H 
17.1  Important Functional Considerations 
The following tables lists some functional considerations to keep in mind when 
integrating fieldbus with an Experion system.   
General 
 
Function Indication  Consideration 
Fieldbus device with 
previous address 
assignment is added 
to a Link. .  
Potential to lose Link 
Schedule, if FIM fails 
before "uncommissioned" 
device is "commissioned".  
Always remove the address from a 
used fieldbus device before you store 
it. 
Adding Link Master 
capable device to 
operating Link. 
Potential for LM capable 
device to assume LAS role 
using empty or incorrect 
Link Schedule.  
See the Guidelines for adding fieldbus 
device to "live"/operating Link in the 
Maintenance, Checkout, and 
Calibration section of this document. 
Link Slot Time setting 
is 8 or less. 
A new uncommissioned 
device may not appear in 
the Link directory in the 
Monitoring tab.  
Change the default Slot Time setting to 
10 on the Link Block Parameters form 
in Control Builder.  
(If an uncommissioned device does not 
appear, try increasing the Slot Time 
value by one and cycling power to the 
FIM. Repeat this action, as required.) 
Using automatic 
inactivate/activate 
function in Load 
Dialog box in Control 
Builder 
A component is 
automatically inactivated 
during the load and then 
returned to its active state. 
Do not use this automatic 
inactivate/activate function, if your 
process cannot tolerate the load 
disruption and consequent delay in 
activation.  
Fieldbus device 
designated as 
"backup" Link Master 
cannot handle the 
Link Schedule. (Also, 
see the next row.) 
Device icon turns yellow 
(LM without schedule) or 
red (bad communications). 
The FIM is the primary Link Master for 
both Links. If you designate a device 
as a "backup" Link Master, be sure it 
has the capacity to handle the Link 
Schedule. Otherwise, you may have to 
reconfigure the device as a Basic type 
and restart it to initiate the change, if 
the Link Schedule is too large for it to 
handle.