7. Fieldbus Device Commissioning
7.5. Flowchart Summary
284 Experion PKS Series A Fieldbus Interface Module User's Guide R400
Honeywell July 2010
Stage Funtion Completed
Yes > Go to Stage 33
32
Configure control strategy.
References:
About control strategy configuration
33
Load control strategy to device.
References:
About load operations
34
Are parameters correct?
NO > Go to Stage 35
YES > Go to Stage 36
35
Make required parameter changes on-line to device.
References:
Monitoring/Interacting with given component/block
36
Upload device to project.
References:
Load Interactions for Fieldbus Related Operations
This completes the commissioning process.
The commissioning process is summarized in the following
flowchart.
7.5 Flowchart Summary
The commissioning stages outlined above are summarized in the following flowchart.