EasyManua.ls Logo

Honeywell Series A - 7.4 Checking Control Strategy

Honeywell Series A
560 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Fieldbus Device Commissioning
7.4. Checking Control Strategy
R400 Experion PKS Series A Fieldbus Interface Module User's Guide 283
July 2010 Honeywell
Stage Funtion Completed
Making a fieldbus device type from vendor DD
25
Match device.
If you are running software version R210 or greater, a wizard is
provided to guide you through the steps for matching an
uncomisisioned device.
References:
Matching uncommissioned device to project device or vice versa
26
Load (Partial Load) the new device from Project tab.
References:
Loading Link contents or fieldbus device
27
Measure and compare H1 segment baseline with Fluke
Scopemeter and Relcom FTB-3 or equivalent equipment.
28
Are measurements within specifications?
NO > Go to Stage 29
YES > Go to Stage 30
29
Identify source of noise or communication problems and repair or
replace equipment as required.
Return to Stage 27
30
Do you need to add more devices on this segment?
NO > Go to Stage 31 in the next section Checking Control
Strategy.
YES > Return to Stage 8 in previous section Connecting
Devices.
7.4 Checking Control Strategy
Stage Funtion Completed
31
Is control strategy configured?
NO > Go to Stage 32

Table of Contents

Related product manuals