6. Operation
6.3. Monitoring Fieldbus Functions Through Monitoring Tab
R400 Experion PKS Series A Fieldbus Interface Module User's Guide 269
July 2010 Honeywell
If You Are in the . . . Then, you can
And, the Link Schedule Configuration
shows. . .
Project Tab
Right-click the Link
icon and select Open
Chart from the list.
Or,
Double-click the Link
icon.
The block execution and data publications for
all Control Modules that are configured in
Project and assigned to the LINK or CEE. And,
they contain fieldbus function blocks that are
associated with a device assigned to the given
Link, and/or Experion blocks that participate in
Link publications. See the Sample Link
Schedule configuration display in Project
Figure that follows this table for reference.
Monitoring Tab
Same as above.
The block execution and data publications for
all applicable Control Modules configured and
assigned in Project and loaded to the LINK or
CEE. See the Sample Link Schedule
configuration display in Monitoring Figure that
follows this table for reference.