8. Maintenance, Checkout, and Calibration
8.1. Adding, Removing and Replacing Components
296 Experion PKS Series A Fieldbus Interface Module User's Guide R400
Honeywell July 2010
Step Action Result
TIP
If you elect to Cancel the load at this time, be sure you complete the device load
before you return the system to normal operation.
If you are replacing a device that includes instantiated blocks, you must re-load any
Control Module and Sequential Control Module that include client/server connections
to the blocks in the replacement device from the Monitor tab before putting the device
into operation. See Instantiable block implementation considerations for more
information.