8. Maintenance, Checkout, and Calibration
8.1. Adding, Removing and Replacing Components
R400 Experion PKS Series A Fieldbus Interface Module User's Guide 309
July 2010 Honeywell
Step Action Result
23
Click
to open the FIM, LINK and
Device directories in Project tab.
Expands directories to show contents.
24
Double-click the device (ST101) icon. Opens Device Block Parameters form.
25
Check that the Device Network Node
Address entry matches the address for
the failed device. If required, key in
matching address. Click Ok to close
form.
Address for the replacement device
matches the address assignment of the
failed device.
26
In Project tab, double-click CM (pidloop)
that contains unassigned function block
for failed device.
Opens CM in control chart.