8. Maintenance, Checkout, and Calibration
8.1. Adding, Removing and Replacing Components
R400 Experion PKS Series A Fieldbus Interface Module User's Guide 315
July 2010 Honeywell
Step Action Result
41
Wait for load to complete and check that
UCD changes to commissioned device,
in Monitoring tab.
42
In Project tab, click CEE with
reconfigured CM and click Controller-
>Load With Contents.
Calls up Load Dialog.