18. Appendix I
18.2. Description
R400 Experion PKS Series A Fieldbus Interface Module User's Guide 541
July 2010 Honeywell
Tab
Parameter Default Value Description
Link Schedule
Optimization
(SCHDOPTIMIZE)
OPT
Specifies if the link schedule is
to be automatically optimized or
not.
Use the OPT selection for Link
Scheduling Optimization that
changes ORDERINCM values.
The optimized schedule is used
to update the natural schedule
details. The
ORDERINLINK/ORDERINCM
parameter values are updated
to match the sequence of the
optimized schedule. The next
time that the schedule is
viewed/loaded no prompt asks
for confirmation of the action.
Use the OPT_NOFORCE
selection for Link Scheduling
Optimization that ignores
ORDERINCM values. The
optimized schedule is used to
update the natural schedule
details. The
ORDERINLINK/ORDERINCM
parameter values are left
unchanged. The next time that
the schedule is viewed/loaded a
prompt will ask for confirmation
of this action.
Use the NO_OPT selection to
disable Link Schedule
Optimization for this Link and
use ORDERINCM values. The
natural schedule is used. The
DISABLELINKOPT is set true
so that an optimized schedule is
no longer created for the link. If
an optimized schedule is
required later, change this
parameter selection to OPT or
OPT_NOFORCE.