Figure 4-46 Commissioning successfully
● Figure 4-47 is displayed if component commissioning fails, which ends
startup wizard commissioning.
Figure 4-47 Commissioning unsuccessfully
– If commissioning fails, tap Commissioning failed. In Figure 4-47 to view the
details, as shown in Figure 4-48.
– After the fault is cleared, choose Maint > Wizard Startup to enter the wizard
startup screen for new commissioning.
Figure 4-48 Details of failure
----End
NetCol5000-A025 In-row Air Cooled Smart Cooling
Product
User Manual (300 mm Width) 4 Power-On Commissioning