11.8 3rd + 4th PTO (configurations)
Fig. 11.45
11.8.1 Information
Hydraulic pumps on the 3rd and 4th PTO can be installed at the
same time.
In some configurations, there is also the centering ring
C
on the
4th PTO.
Important
For disassembly or installation, refer to Par. 11.5 , Par.
11.6 e Par. 11.7 .
Always replace the gasket of the rings B and C and
flanges D and K at each assembly.
Lubricate the gear H with oil.