EasyManuals Logo

Kohler KDI 1903 TCR Workshop Manual

Kohler KDI 1903 TCR
315 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #298 background imageLoading...
Page #298 background image
EN
298
12.4 Rubber hoses and manifolds check
Important
ï‚·
Before proceeding with operation, read Par. 3.3.2 .
The check is carried out by applying slight deflection or
bending along the tube/hose and next to the hose clamps.
Components must be replaced if they have clear signs of
cracks, tears, cuts, leaks, or do not retain a certain degree of
elasticity.
1.
Check the condition of all rubber hoses A .
2.
Check whether there are any leakages of air,
refrigerant, oil or fuel next to their connections.
Fig 12.4
Fig 12.5

Table of Contents

Other manuals for Kohler KDI 1903 TCR

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler KDI 1903 TCR and is the answer not in the manual?

Kohler KDI 1903 TCR Specifications

General IconGeneral
BrandKohler
ModelKDI 1903 TCR
CategoryEngine
LanguageEnglish

Related product manuals