EasyManua.ls Logo

Komatsu PC2000-8 - Page 240

Komatsu PC2000-8
504 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MACHINE OPERATIONS AND CONTROLS OPERATION
3-174
2. It is possible to judge the water level and amount of sedi-
ment by looking through transparent cap (1). If there is any
water or sediment collected at the bottom, set a container
to catch the drain water under drain hose (3).
3. Pull up fuel shut-off lever (A) installed at the front of the
main pump inside the pump room to shut off the fuel supply
circuit from the fuel tank.
(S): Shut off
(O): Open

Table of Contents

Related product manuals