BA 35101/02/ 03 EN – Edition 1.0 * 35101_02_03b340.fm 3-71
Operation
Loading loose material
☞ Loading loose material
• Align the blade parallel with the ground A
• Lower the loader unit to the ground B. To do this: push the control lever forwards C
• Drive forwards into the material A
☞ When the engine speed decrease due to too much material:
• Slightly raise the loader unit B. To do this: pull the control lever backwards D
Loading if the material is hard to penetrate
☞ Loading if the material is hard to penetrate
• As for loading loose material, but in addition:
• Tilt the bucket in and out a little. To do this: move the control lever to the left and right
A and B
☞ Ending loading:
• Dump in the bucket C. To do this: push the control lever to the left A
• Reduce engine speed
• Reverse out of the material A
• Raise the bucket to transport position B
A
Fig. 110: Horizontal lowering of the loader unit
C
B
Fig. 111: Driving into the material
B
A
D
Fig. 112: Loading if the material is hard to penetrate
B
A
Fig. 113: Tilting in the bucket
C
A
B
A