EasyManua.ls Logo

Kramer 380

Kramer 380
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-84 BA 35101/02/03 EN – Edition 1.0 * 35101_02_03b340.fm
Operation
Backfilling round gravel and precise unloading
Backfilling round gravel
Precise dosing and placement of pourable material
Bucket teeth move back from the wall as the bucket opens
Unloading from the bottom of the bucket for increased dump heights
Unloading from the bottom of the bucket for increased dump heights
Increases the dump height by at least 55 cm (depending on bucket size), as
compared to dumping with a standard bucket
Important!
Smaller dump reach is compensated by pushing the material with the open
multipurpose bucket as shown
Ansi cht_012.i so
Ansic ht_011.iso
Fig. 136: Backfilling and unloading material with a multipur-
pose bucket
Ansi cht_010.iso
Ansi cht_013.iso
Fig. 137: Unloading from the bottom of a multipurpose
bucket

Table of Contents

Related product manuals