3-84 BA 35101/02/03 EN – Edition 1.0 * 35101_02_03b340.fm
Operation
Backfilling round gravel and precise unloading
☞ Backfilling round gravel
• Precise dosing and placement of pourable material
• Bucket teeth move back from the wall as the bucket opens
Unloading from the bottom of the bucket for increased dump heights
☞ Unloading from the bottom of the bucket for increased dump heights
• Increases the dump height by at least 55 cm (depending on bucket size), as
compared to dumping with a standard bucket
Smaller dump reach is compensated by pushing the material with the open
multipurpose bucket as shown
Ansi cht_012.i so
Ansic ht_011.iso
Fig. 136: Backfilling and unloading material with a multipur-
pose bucket
Ansi cht_010.iso
Ansi cht_013.iso
Fig. 137: Unloading from the bottom of a multipurpose
bucket