Rigging work
12.8 Rigging the auxiliary hoist
Operating manual GMK 6400 3 112 993 en 12 - 97
12.07.2013
5. Continue rigging the counterweight; à CHECKLIST: Counterweight,
unrigging
, p. 12 - 65, point 5. and point 6.
6. Release the locking pin between the auxiliary hoist and the 15 t base
plate using the hand-held control;
à Locking/unlocking the auxiliary
hoist
, p. 12 - 102.
7. Disconnect the hand-held control;
à p. 12 - 22.
8. Detach the electrical connection to the auxiliary hoist;
à p. 12 - 101.
Detach the hydraulic connection to the auxiliary hoist;
à p. 12 - 100.
9. Sling the auxiliary hoist and place it on the separate vehicle;
à Slinging points and transport, p. 12 - 92.
10. Check the transport position of the auxiliary hoist;
à Transport,
p. 12 - 93.