Install a Front Indicator Panel
3.
Position the faceplate over the panel, install the Torx screws, and tighten the
captive screws to secure the faceplate to the panel.
4.
Switch on the appropriate PDU circuit breakers and power on the server.
See “Returning the Server to Operation” on page 73.
5.
Verify that the fault has been cleared and the replaced component is operational.
See “Verify That a Fault Has Been Cleared” on page 54.
6.
Return the replaced component to Oracle.
224 SPARC M8 and SPARC M7 Servers Service Manual • September 2017