EasyManuals Logo

Oracle SPARC M8 User Manual

Default Icon
330 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #227 background imageLoading...
Page #227 background image
Servicing the Front Indicator Panel Cable
The front indicator panel cable connects the front indicator panel to the chassis.
Caution - This procedure requires that you handle components that are sensitive to electrostatic
discharge. This discharge can cause server components to fail. Follow antistatic precautions to
prevent electrostatic damage. See “Prevent ESD Damage” on page 61.
These topics explain how to service the front indicator panel cable.
“Remove the Front Indicator Panel Cable” on page 227
“Install the Front Indicator Panel Cable” on page 232
Related Information
“Identifying Components” on page 15
“Detecting and Managing Faults” on page 35
“Preparing for Service” on page 57
“Controlling the Server and Domains” on page 67
“Understanding Server Configurations and Failover Behavior” on page 79
Remove the Front Indicator Panel Cable
This procedure can be performed only by qualified service personnel.
Caution - Remove AC power using the circuit breakers on the appropriate PDU before
performing this procedure.
1.
Determine which front indicator panel cable requires service.
See “Identify Faulted Components” on page 36.
Servicing the Front Indicator Panel Cable 227

Table of Contents

Other manuals for Oracle SPARC M8

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle SPARC M8 and is the answer not in the manual?

Oracle SPARC M8 Specifications

General IconGeneral
BrandOracle
ModelSPARC M8
CategoryServer
LanguageEnglish

Related product manuals