EasyManuals Logo

Oracle SPARC M8 User Manual

Default Icon
330 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #277 background imageLoading...
Page #277 background image
Servicing the Switch Chassis
There is one switch chassis in the SPARC M7-16 server. For the location of the switch chassis,
see “Server Front Components (SPARC M7-16)” on page 18 and “Server Rear Components
(SPARC M7-16)” on page 19.
Caution - This procedure requires that you handle components that are sensitive to electrostatic
discharge. This discharge can cause server components to fail. Follow antistatic precautions to
prevent electrostatic damage. See “Prevent ESD Damage” on page 61.
These topics explain how to service the switch chassis.
“Remove a Switch Chassis” on page 277
“Install a Switch Chassis” on page 283
Related Information
“Identifying Components” on page 15
“Detecting and Managing Faults” on page 35
“Preparing for Service” on page 57
“Controlling the Server and Domains” on page 67
“Understanding Server Configurations and Failover Behavior” on page 79
Remove a Switch Chassis
This procedure can be performed only by qualified service personnel. Power down the server
completely before performing this procedure.
1.
Take the necessary ESD precautions.
See “Prevent ESD Damage” on page 61.
2.
Power off the server and switch off the appropriate PDU circuit breakers.
Servicing the Switch Chassis 277

Table of Contents

Other manuals for Oracle SPARC M8

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle SPARC M8 and is the answer not in the manual?

Oracle SPARC M8 Specifications

General IconGeneral
BrandOracle
ModelSPARC M8
CategoryServer
LanguageEnglish

Related product manuals