Remove a Switch Unit
4.
Pull the switch unit out of the server less than halfway.
Related Information
■
“Remove a Switch Unit” on page 194
■
“Reseat a Switch Unit” on page 196
■
“Switch Chassis Cooling Zones” on page 31
Remove a Switch Unit
This procedure can be performed by a customer while the server is running.
194 SPARC M8 and SPARC M7 Servers Service Manual • September 2017