Install a Switch Chassis
8.
From the rear of the server, install the top hold-down brackets.
9.
Switch on the appropriate PDU circuit breakers and power on the server.
“Returning the Server to Operation” on page 73.
10.
Verify that the fault has been cleared and the replaced component is operational.
See “Verify That a Fault Has Been Cleared” on page 54.
Related Information
■
“Remove a Switch Chassis” on page 277
■
“Servicing the CMIOU Chassis” on page 269
284 SPARC M8 and SPARC M7 Servers Service Manual • September 2017