Roche Diagnostics
132 Instructions for Use · Version 13.0
5 Installation and put out of operation cobas b 123 POC system
Installing the instrument
2
Connect the power supply to the instrument, and then connect it to the power
supply network.
Figure 5-3 Power supply interface location: Hardware version 1
Figure 5-4 Power supply interface location: Hardware version 2
3
To turn on the instrument, press the on/off button.
Figure 5-5 On/off button location
A Power supply interface
A Power supply interface
A On/off button
A
A
A