Appendix F – Link Install and Commissioning Logs
Standardized forms are provided here for use during the installation and configuration
phase and to serve as a record of the link performance at the time of installation. It is
highly recommended that the operator use the status save feature in the radio to save
the state of the link upon commissioning.