TITANUS
MICRO·SENS
®
06/13
9
7 Installation Pipe System 141
7.1 General assembly 141
7.1.1 Mounting pipe system 141
7.1.2 Mounting air sampling hose 143
7.2 Linear expansion of the pipe system 145
7.3 Patented air sampling points 147
7.4 Ceiling lead through 149
7.4.1 Ceilings feed-through for false ceiling 149
7.4.2 Other ceilings feed-through 150
7.5 Monitoring in forced air flow systems (ventilation or climatic
applications)
152
7.5.1 Detection at air inlets/outlets 152
7.5.2 Detection in bypass systems 153
7.6 Filter 154
7.6.1 Installation of air filter, type LF-AD-x 154
7.6.2 Mounting of the special filter type SF-400/650 155
7.7 Air return 157
7.8 Noise suppressor 158
7.9 3-Way ball valve 159
7.10 Steam trap 161
7.10.1 Steam trap type KA-DN-25 161
7.10.2 Steam trap type KA-1 162
7.11 Test adapter 163