Appendix for Accu-Chek Inform II Base Unit (legacy version) • F
237
08424705001 (01) 2017-04 USA • Accu-Chek Inform II Operator’s Manual Version 6
F.2 Connecting the base unit (legacy version)
1 Slide the base unit upward and remove it from the
wall mount (if in use).
2 Connect the power supply to the power input jack.
3 If you want to connect the Accu-Chek
Inform II Base Unit in a wired environment:
Connect the Ethernet (RJ45) cable or the USB cable
to the respective outlet. Use only the USB cable
provided with the Accu-Chek Inform II system.
4 Slide the base unit back onto the wall mount (if in
use).
NOTICE
To ensure continuous safe and reliable operation, use
only the pow
er supply unit provided for the Accu-Chek
Inform II system (for ordering information see page 175).
For details on configuring the Accu-Chek Inform II
Base Unit, contact Accu-Chek Customer Care.