EasyManuals Logo

Ag Leader Integra Display User Manual

Ag Leader Integra Display
376 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #286 background imageLoading...
Page #286 background image
270 Firmware Version 6.0
3. Acknowledge the Warning
A warning appears, stating that you must circulate the product back to the Direct Injection tank.
Acknowledge the warning by pressing .
4. Start Pump and Set Desired Speed
The Injection Pump Prime screen appears. The
countdown time remaining is shown in the black box.
The bar underneath turns green when the pump is
operating. Use
/
to manually increase or
decrease the pump speed.
Note: The recommended priming time is three minutes (3:00), but the routine can be ended at any time by
pressing .
5. Acknowledge the Warning. A warning appears, stating that you must return chemical injection
plumbing to a field-ready state. Acknowledge the warning by pressing .
LOAD CONFIGURATION
Press: Select Event button.
Select a Season, Grower, Farm, and
Field on the Management Selection
screen.
For more information, see
“Setup Event” on page 45.
RUN CONFIGURATION
Once a configuration has been completed, the Map View button appears at the bottom of the
Home screen. Press the Map View button to see the Map screen. The map below is displayed
in Zoom to Detail view.
Injection Pump Prime
Use increase/decrease arrows to start pump and set to desired speed.
Time Remaining
Select Event

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ag Leader Integra Display and is the answer not in the manual?

Ag Leader Integra Display Specifications

General IconGeneral
BrandAg Leader
ModelIntegra Display
CategoryMonitor
LanguageEnglish

Related product manuals