EasyManua.ls Logo

Avaya PARTNER Advanced Communications System - Installing the Control Unit

Avaya PARTNER Advanced Communications System
468 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PARTNER
®
Advanced Communications System Installation, Programming, and Use
Installing the Control Unit
2-4
Installing the Control Unit 2
The stand-alone processor module or a carrier and its modules are referred to as the control unit.
The control unit must always be wall-mounted.
WARNING:
There are no customer-serviceable components inside the system modules or carrier. There
are hazardous voltages within that can cause severe or fatal personal injury. DO NOT OPEN
MODULES.
Wall-Mounting the Control Unit 2
Before installing the system, be sure you read the safety instructions in the front of this
guide.
To install the control unit, you must do the following:
Wall-mount the control unit.
Label the jacks.
Ground the system.
Insert the batteries into the processor module.
Initialize the system.
Check the LEDs on the modules.
The PARTNER Advanced Communications System can be installed in one of three
configurations:
Stand-alone PARTNER ACS processor module
2-Slot Carrier, which can hold up to two modules
5-Slot Carrier, which can hold up to five modules

Table of Contents

Other manuals for Avaya PARTNER Advanced Communications System

Related product manuals