PARTNER
®
Advanced Communications System Installation, Programming, and Use
Installing the Control Unit
2-4
Installing the Control Unit 2
The stand-alone processor module or a carrier and its modules are referred to as the control unit.
The control unit must always be wall-mounted.
WARNING:
There are no customer-serviceable components inside the system modules or carrier. There
are hazardous voltages within that can cause severe or fatal personal injury. DO NOT OPEN
MODULES.
Wall-Mounting the Control Unit 2
Before installing the system, be sure you read the safety instructions in the front of this
guide.
To install the control unit, you must do the following:
■ Wall-mount the control unit.
■ Label the jacks.
■ Ground the system.
■ Insert the batteries into the processor module.
■ Initialize the system.
■ Check the LEDs on the modules.
The PARTNER Advanced Communications System can be installed in one of three
configurations:
■ Stand-alone PARTNER ACS processor module
■ 2-Slot Carrier, which can hold up to two modules
■ 5-Slot Carrier, which can hold up to five modules