EasyManua.ls Logo

Fujitsu PRIMERGY TX140 S2 - Software Configuration; Removing the UFM; Preliminary Steps

Fujitsu PRIMERGY TX140 S2
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TX140 S2
Upgrade and Maintenance Manual 257
System board and components
14.3.1.4 Software configuration
The UFM delivery set includes the "Recovery Tool CD" to setup the ESXi
configuration. Proceed as follows:
Ê Switch on the server.
Ê Right after switching on the server, insert the "Recovery Tool CD" into the
DVD drive and close the drive tray.
Ê The server should now boot from the "Recovery Tool CD".
Ê Follow the on-screen instructions.
14.3.2 Removing the UFM
14.3.2.1 Preliminary steps
Ê "Disabling BitLocker functionality" on page 69
Ê "Locating the defective server" on page 43
Ê "Shutting down the server" on page 46
Ê "Disconnecting the server from the mains" on page 46
Ê "Getting access to the component" on page 47
Field Replaceable Unit
(FRU)
Hardware: 5 minutes
Tools: Phillips PH1 / (+) No. 1 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY TX140 S2

Related product manuals